Skip to Content

Sewer Line Upsize in Perris, CA

Innovative pipebursting approach successfully upsizes old trunk sewer line to serve a new Southern California subdivision

Challenge
Burst a 350-foot-long trunk line, replacing 10-inch clay pipe with 14-inch SDR-17 polyethylene pipe.

Solution
We helped Young Homes close escrow on the 95 homes in its Perris, CA development when the Eastern Municipal Water District (EMWD) required them to upsize a 10-inch ID clay trunk sewer line to 12-inch ID pipe to create a sufficient fall between the last two manholes in its system. EMWD had specified bench construction for the excavation because a quarter of the 350-foot line was beneath a busy street parallel to a railroad track and the remainder followed a dirt service road bordering a small airport. The line was only 8 feet deep, so requiring a large open trench on either side made no sense. Pipebursting allowed us to avoid an 18-foot-wide gouge in the main road. After a week of prep and flow bypass, we worked with Zednem Construction of Chino, CA to overcome serious installation challenges to complete the replacement in less than a week.

Client:
Young Homes – Rancho Cucamonga, CA

Technology Utilized:
100-ton TRIC Tools ram, three-phase, high-pressure 7,500 psi Power Team hydraulic pump

Call (888) 883-8742 angle-down arrow-down arrow-right arrow-up-right bucket bubble checkmark cross droplet envelop facebook facebook22 fire folder google-plus instagram lamp linkedin location menu office phone play3 price-tag power quotes-left quotes-right spinner star-empty star-full star-half twitter user wrench yelp youtube ReviewsOpen Reviews